It is an exciting time in WaterColor as two highly anticipated expansion projects have been underway since 2019 by the WaterColor Community Association (WCA):  WaterColor Beach Club Expansion & Camp WaterColor Expansion.  

At WaterColor Inn, we care about the experience our guests have and want to provide the best communication regarding these expansions.  We know these two amenities are extremely valued and thank everyone for their continued support during this time of improvement.  All guests staying at WaterColor Inn currently enjoy the following amenities:

  • WaterColor Beach Club-  Phase 1 is NOW OPEN Daily, 9 AM- 7 PM, with pool, beverage and limited grab-and-go menu items.
  • Camp WaterColor- NOW OPEN with 3 pools and food and beverage service.
  • Direct access to our beautiful beaches with beach chair setup services available
  • Access to Adults Only Pool at WaterColor Inn
  • Access to 3 Resort Pools in WaterColor (LakeHouse, Sand Hill, Dragonfly)
  • Access to WaterColor Workout Facility
  • Complimentary Bike, Kayak and Canoe Rentals

As with all construction projects, there is not a confirmed date of completion and all timeframes mentioned are estimated as a reference only.  Any bookings made are not guaranteed to have access to the below amenities at WaterColor Beach Club until final completion has been confirmed.  

Camp WaterColor- Now OPEN!

Camp WaterColor Aerial View

Camp WaterColor Amenities to Enjoy:

  • Main Butterfly Pool with Monarch Slide is Open; Lifeguard Staffed. 
  • Caterpillar Pool (Zero-Entry, Children's Area with Skipper Slide) is Open.
  • Lazy Lizard Pool (Zero-Entry, Lazy River) is Open
  • Basketball Court is Open
  • Playground is Open
  • The Canteen Restaurant & Bar is open daily from 11 AM - 7:30 PM, serving food and drinks.

NOTE:  Towel services at Camp WaterColor will not be available during the off-season; towel services will resume on March 1, 2020.

*Above image of Camp WaterColor was taken on Friday, March 22, 2019.  For more images of Camp WaterColor, visit our Photo Gallery.

WaterColor Beach Club- Phase 1 NOW OPEN!

WaterColor Beach Club 2019 Expansion

WaterColor Beach Club Proposed Rendering
(There may be some variation from final completed project at WaterColor Beach Club.)

WaterColor Beach Club Updates as of January 10, 2020:

WaterColor Beach Club

Phase 1 of the expansion is NOW OPEN Daily, 9 AM - 7 PM.  This phase includes:

  • Refurbished Main Pool on the Upper Deck
  • Expanded Rita Bar* level with Additional Lounge and Seating Area
  • Expanded Seating/Lounge Areas on the Main Pool Deck 
  • Newly Designed Welcome Reception Area
  • Beverages and grab-and-go menu items provided by FOOW on the pool deck.

Phase 2 of the expansion is anticipated to be completed by early spring of 2020. This phase will include:

  • Enlarged WaterColor Grill Restaurant with Indoor and Outdoor Seating.
  • Second Pool Deck wih Additional Lounge Seating
  • Third Pool with Zero-Entry and Additional Lounge Seating
  • Quick Service Restaurant with Seating on the Lower Deck

Construction Updates:

  • Construction continues to move forward
  • During the past week and continuing into next week, contractors are working on installing railing and getting the new pool equipment room operational
  • They are also preparing the slab for the main pool deck bar.
  • Next week, they'll begin paver installation on the second level pool deck