Book Now
WaterColor Beach

WaterColor Expansion Project Updates

It is an exciting time in WaterColor as two highly anticipated expansion projects are underway by the WaterColor Community Association (WCA):  WaterColor Beach Club Expansion & Camp WaterColor Expansion.  

At WaterColor Inn, we care about the experience our guests have and want to provide the best communication regarding these expansions.  We know these two amenities are extremely valued and thank everyone for their continued support during this time of improvement.  All guests staying at WaterColor Inn currently enjoy the following amenities:

  • Direct access to our beautiful beaches with beach chair setup services available
  • Access to Adults Only Pool at WaterColor Inn
  • Access to 3 Resort Pools in WaterColor (LakeHouse, Sand Hill, Dragonfly)
  • Access to WaterColor Workout Facility
  • Complimentary Bike, Kayak and Canoe Rentals

As with all construction projects, there is not a confirmed date of completion and all timeframes mentioned are estimated as a reference only.  Any bookings made are not guaranteed to have access to the below amenities at Camp WaterColor and WaterColor Beach Club until final completion has been confirmed.  

Camp WaterColor- Now OPEN!

Camp WaterColor Aerial View

Camp WaterColor Updates as of April 15, 2019:

  • Main Butterfly Pool with Monarch Slide is Open and Heated; Lifeguard Staffed. 
  • Caterpillar Pool (Zero-Entry, Children's Area with Skipper Slide) is Open
  • Lazy Lizard Pool (Zero-Entry, Lazy River) is Open
  • Basketball Court is Open
  • Playground is Open
  • The Canteen Bar is Open Serving Non-alcoholic Beverages, as well as Beer and Wine.
  • Guests are Currently Allowed to Bring in Outside Food (No Outside Beverages) until The Canteen is Open (TBD)

*Above image of Camp WaterColor was taken on Friday, March 22, 2019.  For more images of Camp WaterColor, visit our Photo Gallery.

Camp WaterColor Celebration Offer

Stay three nights or more Sunday- Thursday and enjoy 30% OFF your stay at WaterColor Inn now through May 23, 2019.

WaterColor Beach Club- In Progress

WaterColor Beach Club 2019 Expansion

WaterColor Beach Club Updates as of April 13, 2019:

Phase 1 of the expansion is expected to be completed by early Summer 2019. This phase will include:

  • Refurbished Main Pool on the Upper Deck
  • Expanded Rita Bar level with Additional Lounge and Seating Area
  • Expanded Seating/Lounge Areas on the Main Pool Deck 
  • Enlarged WaterColor Grill Restaurant with Indoor and Outdoor Seating
  • Newly Designed Welcome Reception Area 

Phase 2 of the expansion is expected to be completed by late Fall 2019. This phase will include:

  • Second Pool Deck wih Additional Lounge Seating
  • Third Pool with Zero-Entry and Additional Lounge Seating
  • Quick Service Restaurant with Seating on the Lower Deck
*Above image is a rendering of proposed project and there may be some variation from final completed project at WaterColor Beach Club.